Email: contact@bissett-and-robson.co.uk
Phone: 02392 640 866  Phone: 02392 699 491
Mobile:  07774 410 710  Mobile:  07786 654 365
Company No: 06512724

Obtaining Planning Permission | Building Regulations

Gas Appliances - Callout To Repair - Install - Check

 
Gas Appliance

Overview Of Planning Regulations

Remodelling your home with a loft conversion or house extension is a major undertaking and requires careful planning and costings and included in this upgrade is quite often a boiler change or bathroom installation.

The Government’s Planning Portal is a good place to start your research and to find out the legal and logistic requirements from a simple boarding up with floors in the loft to the full remodel, including boilers and every element of solar panels and solar heating that supports the changes.

Bathrooms can be added to most types of extensions and conversions depending on the location of drain services and water supplies. Extensions can also include a kitchen and living spaces to suit your specific requirements.

 
 
Boiler Heating Systems

Where To Start

The thought of starting a new house build or even an extension to your current property can seem daunting to some and a building challenge to others. The important thing is to obtain honest and affordable advice. The internet is a wealth of information and you can easily be led down false paths.

Start by looking at the UK Government's website at the Planning Portal. In a clear and well presented graphical interface the rules are clearly spelt out and can form an excellent basis for your project.

 
 
Gas Appliances In The Home

What Permissions Are Required?

The good thing about the guide is that the graphical interface allows you to choose which area of your property that you want to investigate the rules and how they apply to what you wish to do. The areas fall into the following categories:

  • Roofing.
  • Exterior Walls.
  • Chimneys.
  • Extensions and additions to the main building of the property.
  • Windows and doors.
  • Garages.
  • Sheds.
  • Fuel tanks.
 
 
Gas heating Services

How Can I Apply For Planning Permission?

There are two ways to apply for Planning permission. It can be complete in writing and submitted to the appropriate authority or it can also be completed online at Planning Applications. In many cases a hand drawing of the plan is sufficient in cases such as having a conservatory built. Obviously measurements and descriptions are to be accurate but the Planners do not always require an Architect's drawing to give their permission for the build to go ahead. Guidance for all of this is given on the website.

The "Need More Information" area of the Planning Applications is a wealth of information and will clearly lead you through all the development stages.

 
 
Radiator Power Flushing

How Do I Obtain A Plan?

Lastly, where do you get a plan for your new house or extension? The Planning Portal has plenty of advice on this aspect at their "Buy A Plan" page. Their recommendations for online companies all offer free registration and search facilities so that you can resource your plan before you buy.

Alternatively, find an architect but do take care with who you choose and research the architect you choose carefully. The Architects Registration Board is a good place to start and finding others to recommend one is always a good option as is the professional section of Checkatrade, where feedback is given on registered architects in your area of past work, by their Clients.

 

 
Heating Engineers In Hampshire
Obtaining Planning Permission


Bissett & Robson gas and heating engineers are your local and trustworthy gas installers and maintenance team, covering Hampshire, Sussex and Surrey.
Phone: 02392 640 866      Phone: 02392 699 491
Mobile:  07774 410 710      Mobile:  07786 654 365
EMAIL: contact@bissett-and-robson.co.uk

 

Hampshire & Sussex Locations:
Chichester - Emsworth - Fareham - Hampshire - Havant - Hayling
Petersfield - Portsmouth - Southampton - Titchfield - Waterlooville - Sussex